Snagging

Snagging

Snagging refers to the process of identifying and documenting defects, deficiencies, or imperfections in a newly constructed or renovated property before it is handed over to the owner or occupant. This process is crucial for ensuring that the property meets quality standards and that any issues are rectified by the developer or contractor before final acceptance.

Purpose and Timing of Snagging

The primary purpose of snagging is to identify and rectify any defects or deficiencies in the construction or finishing of a property. Snagging helps ensure that the property meets the expectations and specifications outlined in the construction contract or building plans. It provides an opportunity for the developer or contractor to address issues before the property is occupied or used by the owner.

Snagging typically occurs towards the end of the construction or renovation process, once the majority of the work has been completed. It may take place before the final handover of the property to the owner or occupant, allowing sufficient time for any identified issues to be addressed.

The snagging process involves a thorough inspection of the property, both internally and externally, to identify any defects or deficiencies. Property owners or their representatives, often referred to as snaggers or snagging inspectors, conduct the inspection using a checklist or snagging report. Defects can range from minor cosmetic issues such as paint chips or scratches to more significant structural or functional problems.

Snagging Checklist and Rectification of Defects​

A snagging checklist outlines specific areas and components of the property to be inspected, including walls, ceilings, floors, windows, doors, fixtures, fittings, and utilities. Common issues to look for include uneven surfaces, cracks, gaps, leaks, loose fittings, faulty electrical or plumbing fixtures, and incomplete or substandard workmanship. During the inspection, snaggers document each identified defect or issue in detail, including its location, description, severity, and photographic evidence if necessary. Clear and concise documentation is essential for effectively communicating the nature of the problems to the developer or contractor for resolution.

1. Rectification of Defects: Once the snagging inspection is complete, the snagging report is submitted to the developer or contractor for review and action. The developer or contractor is responsible for rectifying the identified defects within a reasonable timeframe, typically outlined in the construction contract. Property owners may conduct a follow-up inspection to verify that the defects have been adequately addressed before accepting the property.

2. Final Acceptance: After all identified defects have been rectified to the satisfaction of the property owner, the property is considered ready for final acceptance. The owner or occupant formally accepts the property, acknowledging that it meets the required quality standards and specifications. Any outstanding issues or defects not addressed during the snagging process should be documented and resolved through subsequent negotiations or agreements.

Overall, snagging plays a crucial role in ensuring the quality and integrity of newly constructed or renovated properties, helping to identify and rectify defects before they impact the usability or enjoyment of the space. By conducting thorough snagging inspections and effectively addressing identified issues, property owners can ensure that their investment meets their expectations and requirements.